|
|
|
See also [issues](https://gitlab.phaidra.org/gattria6/unnamed-measurement-network-project-preparations/-/issues).
|
|
|
|
|
|
|
|
# Schedule
|
|
|
|
How do we proceed that we have something to show at the rooftop lab's opening in February 2024?
|
|
|
|
|
|
|
|
# Design documents
|
|
|
|
We need to write these documents for requirements and specifications before we can start:
|
|
|
|
- System
|
|
|
|
- Hardware
|
|
|
|
- which devices do we want to support initially?
|
|
|
|
- Software
|
|
|
|
- Protocol
|
|
|
|
|
|
|
|
# Documentation
|
|
|
|
Needed documents:
|
|
|
|
- best practices
|
|
|
|
- test driven development
|
|
|
|
|
|
|
|
# Hardware
|
|
|
|
1. specification
|
|
|
|
1. design
|
|
|
|
1. ordering
|
|
|
|
1. assembly
|
|
|
|
1. testing
|
|
|
|
|
|
|
|
# Software
|
|
|
|
Needed
|
|
|
|
- Microcontroller
|
|
|
|
- base system
|
|
|
|
- device libraries
|
|
|
|
- deployment
|
|
|
|
- GUI: Control
|
|
|
|
- Data acquisition
|
|
|
|
- Visualisation
|
|
|
|
- Dashboards?
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|